Exhibit S-4 — Gould Roofing Company, Inc. Complaint Evidence (2008)

Unlicensed Contracting, Fraud Indicators & City Enforcement Failures

Source Document

“Gould-Broward Complaint – 07/22/08”
Filed with Broward County Permitting / Code Enforcement, submitted by Whistleblower.


Summary of Complaint Evidence

In July 2008, a whistleblower filed a formal complaint regarding roofing and structural work performed by Wilbur Gould / Gould Roofing Co., Inc., including work performed directly on my unit at Omega Villas. The complaint identifies unlicensed or improperly licensed activity, deficient structural repairs, and permit irregularities tied mainly to Phase 2.

Key issues documented include:

  • Structural roof work conducted without proper licensure
  • Ongoing roof and exterior wall leaks after “repairs”
  • Missing, mismatched, or improperly scoped permits
  • Use of substandard materials and improper installation
  • On-site safety violations
  • Noncompliance with Broward County and City of Plantation codes
  • Potential misrepresentation by contractor Vincent Pagan

This complaint forms part of the historical pattern that resulted in the $1M+ in fines ultimately levied by the City of Plantation (2006–2009) — fines that still overwhelmingly impact Phase 2 today.


📣🚨🛑Historic Evidence from 2005–2008 Omega Villas Board Minutes

📣🚨🛑Directly linking the 2008 Gould Roofing Complaint to contemporaneous rogue Board records

A. Roof-Beam Replacement Issues (Mar–Jun 2007)

(From “2007 YE OMEGA VILLAS BOD MINUTES.pdf”)

  • Phase 2 / pool patio roof-beam replacement by Gould
  • Board required permit verification and warranty
  • Payment withheld pending City inspection
    → Shows the Board already suspected documentation gaps and workmanship deficiencies.

B. Phase 2 Roof-Beam Replacement (Mar 2006)

(From “2006 YE OMEGA VILLAS BOD MINUTES.pdf”)

  • Board again demanded permit/warranty proof
    → Establishes multi-year permitting concerns.

C. Pool Patio Beam Replacement (Jun 2006)

  • Permit marked as “pending”
  • Inspection not yet recorded
    → Payment held until verification.

D. Leak Patches (Oct–Dec 2007)

  • Gould recorded for recurring leak repairs
  • No payment until inspection
    → Confirms prior repairs were failing.

E. Vincent Pagan Work (Sep 2007)

  • Listed for electrical/light-pole work
  • No permit trail / no inspection record
    → Same contractor referenced in the 2008 complaint.

F. Related 2007 Compliance Failures

  • City-required plantings/mulch for fence inspection not completed
    → Demonstrates systemic compliance problems.

G. Relevance to Current Investigation (2023–2025)

  • This 2008 complaint is a direct historical precursor to the misconduct occurring today.

This exhibit confirms a continuous pattern:

1. 📣🚨🛑Phase 2 has historically been the epicenter of unlicensed work.

  • 2006–2009: Gould/Pagan → 2025 City fines exceeding $1M
  • 2023–2025: Austro/S&D → potentially defective – unauthorized furring strips, insulation missing, unauthorized scope changes

2. 📣🚨🛑Oversight has failed across 20 years:

  • Improper or unlicensed contractors
  • Permit manipulation
  • Fake or absent inspections
  • City enforcement gaps
  • Law firms protecting the Board (FWB in 2008; Hollander in 2024–2025)

3. 📣🚨🛑2024-Present Misconduct today looks identical to 2008:

  • Unauthorized window removals
  • Missing insulation
  • Unapproved structural changes (Furring Strips & 2/3rds material vote for changing siding from T-111 to Hardie Board!)
  • CAM/contractor “sign-offs” with potentially rubberstamp engineers
  • Complete absence of a construction budget
  • Blocked financial access (Juda Eskew 2024–2025)

Case Study Take-Away Summaries for Federal and State Authorities to All Stakeholders!

📣🚨🛑Phase 2 now carries ~75% of historic fines and remains ground zero for the same pattern of abuse.

📣🚨🛑The pattern is unmistakable:

📣🚨🛑Unlicensed work → concealed defects → financial harm → Board and attorney protection structure → repeat cycle.

📣🚨🛑And at no point — across 2006, 2008, 2010, 2014, 2023, or 2025 — did any state agency intervene, enforce, or correct the violations documented in the historical record.

📣🚨🛑The absence of meaningful oversight is not an isolated incident; it is part of the pattern.

📣🚨🛑 These findings warrant immediate external review by any competent oversight entity — City, County, State, or Federal — due to the systemic nature of the failures.


📌 Master Exhibit Index Components

2008 Stop Work Notice

📹 Video Recordings Relevant to S-4 (Click-Through Timeline)

  1. 🚨🚨May 2024 BOD Meeting – Confrontation with Former President Ken Aker Discussion connected to Gould Roofing and historical roof work. https://youtu.be/TiX9PT3reIg
  2. 🚨🚨February 2024 BOD Meeting – Austro’s “Levy” Discusses Unlicensed/Unpermitted Roofing in Phase 4 Demonstrates the repetition of historical patterns. https://youtu.be/qeeW6etMmQI?si=91xBnrZwz4xpuTkc
  3. 🚨🚨October 2023 BOD Meeting – Whistleblower Challenges Board About $1M+ City Fines Identifying that fines likely stem from the 2008 citations tied to Gould Roofing / Pagan. https://youtu.be/4_YOf41x21s
  4. 🚨🚨2008 Citations Discussed on Record Historic discussion tying Gould’s work to the original City citations. https://youtu.be/E3z60KLjtV8?si=CfN_PKIS4L3MAMBV